Whether your Perth annexe needs full planning permission depends on how it’s built and how it’s genuinely used, mobile and ancillary can mean a much simpler route than permanent and self-contained. We check this properly from the outset.
Get Your Free Route CheckPerth homeowners considering a granny annexe need to understand what actually changes the planning position, self-containment. An outbuilding used incidentally, for storage, a home office, or a hobby room, can be permitted development in Perth, subject to height and coverage conditions.
Introduce a genuine bedroom, bathroom, and kitchen used independently of the main house, and that outbuilding stops being incidental, taking it outside permitted development regardless of size.
A mobile structure meeting the Caravan Sites Act 1968 definition offers a third route for Perth annexes, but only where it genuinely remains ancillary to the household, not a separate residence in its own right. A Perth annexe needing full planning permission usually needs both, our Building Regulations drawings in Perth service covers the technical compliance side, and our structural calculations in Perth service covers the engineering detail.
Caravan Act, permitted development, or full planning
Movable structures that may need no permission at all
Permitted development limits checked properly
Applications built to be approved
We start every Perth annexe project by establishing the real starting point, a mobile structure within Caravan Act limits, an incidental outbuilding, or genuine independent living space, since that single distinction shapes everything that follows.
Your Perth application or certificate, whichever applies, is built around what your local council specifically expects to see, not a generic template.
Structural and building regulations work for Perth annexe projects is handled properly from the outset, informed by real experience with this kind of project.
We treat every Perth annexe project as needing a genuinely honest assessment first, not a sales pitch toward the most expensive route.
Real experience with the Caravan Act, permitted development, and full application routes is what we bring to every Perth project, not a one-size answer.
Structural and building regulations detail for Perth annexes are handled properly from the outset, whichever route your project actually takes. If you need help with a granny annexe, give us a call on 0330 133 5316 or fill in the form below.
This genuinely depends on your specific plans for Perth, we check whether the structure is mobile, incidental, or self-contained before advising either way.
The Caravan Sites Act 1968 sets the limits, 20 metres long, 6.8 metres wide, 3.05 metres internal height, and the structure must be moveable by road in one or two sections, we check whether your Perth plans genuinely meet this.
It depends on genuine use, an incidental Perth outbuilding can qualify under Class E, but introducing real sleeping accommodation used independently takes it outside permitted development regardless of size.
Genuine independence is the test in Perth, if the annexe could function as a separate home on its own, full planning permission is almost always the realistic route.
Strongly recommended for Perth annexes, an assumption that a structure qualifies isn’t the same as formal confirmation, and a Lawful Development Certificate closes that gap.
Yes, we coordinate every part of a Perth annexe project, from establishing the correct route through to building regulations sign-off, so nothing falls through the gap.