Building Near Or Over A Public Sewer

Drainage Build Over Agreements in
Shrewsbury

Extending over or near a public sewer in Shrewsbury needs approval from Severn Trent Water, entirely separate from planning permission itself. Getting the structural detail right the first time keeps this fast, without cutting corners.

Get Started
Local to Shrewsbury
Handled Alongside Severn Trent Water
Fast Turnaround

The Real Process Explained For Shrewsbury

Severn Trent Water treats build over approval for Shrewsbury as a genuine technical review, focused on foundation design and how the proposed structure interacts with the sewer beneath or beside it. This sits entirely separately from your Shrewsbury planning application.

Whether a CCTV inspection’s needed for a Shrewsbury project depends on the specifics, sometimes the sewer’s route and condition are already well established, sometimes Severn Trent Water wants it confirmed first. We arrange it honestly, only where it’s actually required.

Every Shrewsbury enquiry gets checked against both requirements honestly, planning permission and Severn Trent Water’s build over agreement, since conflating the two causes real delay.

CCTV Survey Arranged

Where it’s genuinely required, not as standard

Structural Detail

Foundation design that actually satisfies the sewer body

Design Detail

Drawings that match what’s actually built

Fast Turnaround

Without cutting corners on the detail

Drainage build over agreement

How We Help in Shrewsbury

Every Shrewsbury enquiry starts with locating the sewer route relative to the proposed build, and working out honestly whether Severn Trent Water will need a CCTV survey as part of the submission.

From there, we prepare the structural and design detail Severn Trent Water genuinely needs to see for Shrewsbury, built to satisfy their technical review, not just a generic template.

Given how much attention to detail Severn Trent Water expects for a Shrewsbury build over approval, we stay engaged throughout, right up to a decision.

The Careful Approach To Shrewsbury Build Over Agreements

Every Shrewsbury submission to Severn Trent Water gets checked properly before it goes in, since a poorly prepared application slows down the fast turnaround we’re aiming for.

Being honest about whether a Shrewsbury project needs a CCTV survey, rather than assuming either way, keeps both cost and timeline realistic.

We treat Shrewsbury build over approvals with real care, since Severn Trent Water’s sign-off genuinely affects whether the project can proceed at all.

Planning a house extension planning permission project in Shrewsbury that crosses a sewer route? This is exactly the approval that needs sorting alongside it.

Get Started

Get Your Build Over Agreement Started

Loading your form…

Drainage Build Over Agreement FAQs for Shrewsbury

Do I need planning permission and a build over agreement for Shrewsbury?

They’re two real, distinct requirements. Shrewsbury projects near a public sewer often need both planning permission and separate approval from Severn Trent Water.

Do I always need a CCTV survey for a Shrewsbury build over agreement?

It genuinely varies. Where the sewer’s route and condition are already well documented, Severn Trent Water may not require one for Shrewsbury, otherwise we arrange it.

Who approves a build over agreement in Shrewsbury?

In Shrewsbury, Severn Trent Water handles this specific approval, entirely separate from your local council’s planning process.

How detailed do my Shrewsbury drawings need to be for build over approval?

Severn Trent Water expects real structural detail for Shrewsbury submissions, showing precisely how the build interacts with the sewer beneath or beside it.

How long does build over approval take in Shrewsbury?

Fast turnaround for Shrewsbury genuinely depends on the submission being right the first time, which is why the detail matters so much.

Does the initial assessment for Shrewsbury cost anything?

The initial Shrewsbury consultation is free, you’ll know the real requirements before committing to anything further.