Extending over or near a public sewer in March needs approval from Anglian Water, entirely separate from planning permission itself. Getting the structural detail right the first time keeps this fast, without cutting corners.

Get Started
Local to March (Cambridgeshire)
Handled Alongside Anglian Water
Fast Turnaround

What Anglian Water Actually Needs To See For March

Where a March project involves building over or within close proximity to a public sewer, Anglian Water needs to formally approve it, a genuinely separate process from planning permission, running alongside it rather than replacing it.

A CCTV survey of the existing sewer is sometimes required as part of this in March, though not always, it depends on how well documented the sewer’s exact route and condition already are. We arrange one where it’s genuinely needed, not as a blanket extra.

Every March enquiry gets checked against both requirements honestly, planning permission and Anglian Water’s build over agreement, since conflating the two causes real delay.

CCTV Survey Arranged

Where it’s genuinely required, not as standard

Structural Detail

Foundation design that actually satisfies the sewer body

Design Detail

Drawings that match what’s actually built

Fast Turnaround

Without cutting corners on the detail

Drainage build over agreement

How We Help in March (Cambridgeshire)

Every March enquiry starts with locating the sewer route relative to the proposed build, and working out honestly whether Anglian Water will need a CCTV survey as part of the submission.

From there, we prepare the structural and design detail Anglian Water genuinely needs to see for March, built to satisfy their technical review, not just a generic template.

Given how much attention to detail Anglian Water expects for a March build over approval, we stay engaged throughout, right up to a decision.

Getting March Build Over Approval Right First Time

Every March submission to Anglian Water gets checked properly before it goes in, since a poorly prepared application slows down the fast turnaround we’re aiming for.

Being honest about whether a March project needs a CCTV survey, rather than assuming either way, keeps both cost and timeline realistic.

Whatever a March project actually involves, structural detail, design detail, or both, we prepare it properly for Anglian Water from the outset.

Need structural calculations for a March build near a sewer? The structural detail for both genuinely overlaps, worth handling together.

Get Started

Get Your Build Over Agreement Started

Loading your form…

Drainage Build Over Agreement FAQs for March

Is a build over agreement the same as planning permission in March?

They’re two real, distinct requirements. March projects near a public sewer often need both planning permission and separate approval from Anglian Water.

Do I always need a CCTV survey for a March build over agreement?

Not always, it depends on the specific site. Anglian Water sometimes requires a CCTV survey for March projects to confirm the sewer’s exact route and condition, but not as a blanket rule.

Who approves a build over agreement in March?

In March, Anglian Water handles this specific approval, entirely separate from your local council’s planning process.

What structural information does Anglian Water need for March?

Genuinely detailed, Anglian Water needs to see exactly how the foundation design for March accounts for the sewer’s presence, not a general description.

What’s a realistic timeline for Anglian Water to approve a March project?

Timelines vary by workload, but a properly prepared March submission to Anglian Water moves faster than one that needs revisions.

Does the initial assessment for March cost anything?

Nothing, understanding what your March project genuinely needs from Anglian Water comes before any fee discussion.