Drainage Build Over Agreements in
Godalming (Surrey)
A Godalming extension crossing a public sewer route needs sign-off from Thames Water before work starts. It’s a real, separate approval, and getting the detail right the first time is what keeps the whole thing fast.
Get StartedThe Real Process Explained For Godalming
Thames Water treats build over approval for Godalming as a genuine technical review, focused on foundation design and how the proposed structure interacts with the sewer beneath or beside it. This sits entirely separately from your Godalming planning application.
Whether a CCTV inspection’s needed for a Godalming project depends on the specifics, sometimes the sewer’s route and condition are already well established, sometimes Thames Water wants it confirmed first. We arrange it honestly, only where it’s actually required.
We keep Godalming clients clear on the distinction, Thames Water’s build over approval and planning permission are two separate, real requirements, and missing either causes genuine problems later.
CCTV Survey Arranged
Where it’s genuinely required, not as standard
Structural Detail
Foundation design that actually satisfies the sewer body
Design Detail
Drawings that match what’s actually built
Fast Turnaround
Without cutting corners on the detail
How We Help in Godalming (Surrey)
Every Godalming enquiry starts with locating the sewer route relative to the proposed build, and working out honestly whether Thames Water will need a CCTV survey as part of the submission.
From there, we prepare the structural and design detail Thames Water genuinely needs to see for Godalming, built to satisfy their technical review, not just a generic template.
Given how much attention to detail Thames Water expects for a Godalming build over approval, we stay engaged throughout, right up to a decision.
Getting Godalming Build Over Approval Right First Time
We give Thames Water exactly the structural and design detail they need for a Godalming project, not a generic submission that risks queries and delay.
Being honest about whether a Godalming project needs a CCTV survey, rather than assuming either way, keeps both cost and timeline realistic.
Every Godalming enquiry gets handled with the attention to detail Thames Water expects, not rushed just to hit a fast turnaround.
Planning a house extension planning permission project in Godalming that crosses a sewer route? This is exactly the approval that needs sorting alongside it.
Get Your Build Over Agreement Started
Drainage Build Over Agreement FAQs for Godalming
Do I need planning permission and a build over agreement for Godalming?
No, genuinely separate. Planning permission comes from your local council, while a build over agreement for Godalming comes from Thames Water, both can be needed for the same project.
Do I always need a CCTV survey for a Godalming build over agreement?
Not always, it depends on the specific site. Thames Water sometimes requires a CCTV survey for Godalming projects to confirm the sewer’s exact route and condition, but not as a blanket rule.
Who approves a build over agreement in Godalming?
In Godalming, Thames Water handles this specific approval, entirely separate from your local council’s planning process.
How detailed do my Godalming drawings need to be for build over approval?
Thames Water expects real structural detail for Godalming submissions, showing precisely how the build interacts with the sewer beneath or beside it.
How long does build over approval take in Godalming?
Timelines vary by workload, but a properly prepared Godalming submission to Thames Water moves faster than one that needs revisions.
What does the first consultation cost in Godalming?
Nothing, understanding what your Godalming project genuinely needs from Thames Water comes before any fee discussion.
