Drainage Build Over Agreements in
Earley
Extending over or near a public sewer in Earley needs approval from Thames Water, entirely separate from planning permission itself. Getting the structural detail right the first time keeps this fast, without cutting corners.
Get StartedWhat Thames Water Actually Needs To See For Earley
Where a Earley project involves building over or within close proximity to a public sewer, Thames Water needs to formally approve it, a genuinely separate process from planning permission, running alongside it rather than replacing it.
A CCTV survey of the existing sewer is sometimes required as part of this in Earley, though not always, it depends on how well documented the sewer’s exact route and condition already are. We arrange one where it’s genuinely needed, not as a blanket extra.
We keep Earley clients clear on the distinction, Thames Water’s build over approval and planning permission are two separate, real requirements, and missing either causes genuine problems later.
CCTV Survey Arranged
Where it’s genuinely required, not as standard
Structural Detail
Foundation design that actually satisfies the sewer body
Design Detail
Drawings that match what’s actually built
Fast Turnaround
Without cutting corners on the detail
How We Help in Earley
Earley cases begin with a proper look at the site and the sewer route, not an assumption based on how straightforward the project seems.
What follows addresses exactly what Thames Water needs for Earley, structural detail, design detail, and a CCTV survey where it’s genuinely required.
Once submitted, we track your Earley application with Thames Water closely, since fast turnaround only works if nothing gets left to chase.
Why Earley Projects Get Thames Water’s Attention Right
Attention to detail matters more here than almost anywhere else, Thames Water genuinely scrutinises the structural picture for Earley projects near a sewer.
We only arrange a CCTV survey for Earley projects where Thames Water genuinely requires it, never as a default extra tacked onto every job.
Whatever a Earley project actually involves, structural detail, design detail, or both, we prepare it properly for Thames Water from the outset.
Getting architectural drawings prepared for a Earley extension? Worth flagging early if the sewer route affects the design.
Get Your Build Over Agreement Started
Drainage Build Over Agreement FAQs for Earley
Is a build over agreement the same as planning permission in Earley?
They’re two real, distinct requirements. Earley projects near a public sewer often need both planning permission and separate approval from Thames Water.
Do I always need a CCTV survey for a Earley build over agreement?
Not always, it depends on the specific site. Thames Water sometimes requires a CCTV survey for Earley projects to confirm the sewer’s exact route and condition, but not as a blanket rule.
Who approves a build over agreement in Earley?
Yes, Thames Water is the relevant sewerage company for Earley, and their approval is required before building over or near a public sewer.
How detailed do my Earley drawings need to be for build over approval?
Genuinely detailed, Thames Water needs to see exactly how the foundation design for Earley accounts for the sewer’s presence, not a general description.
What’s a realistic timeline for Thames Water to approve a Earley project?
Timelines vary by workload, but a properly prepared Earley submission to Thames Water moves faster than one that needs revisions.
Does the initial assessment for Earley cost anything?
The initial Earley consultation is free, you’ll know the real requirements before committing to anything further.
